Please upgrade your Flash Player

Latest Update: Friday, July, 04th 2008

To authorize the Chief of Engineers to conduct a feasibility study relating to the construction of a multipurpose project in the Fountain Creek watershed located in the State of Colorado. 12/19/2007--Introduced. Fountain Creek Watershed Feasibility Study Act of 2007 - Directs the Chief of Engineers to complete a study to determine the feasibility of constructing a multipurpose water resources project that shall: (1) be located in the Fountain Creek watershed, Colorado; (2) consist of one or more dams or other structures, other facilities, or management activities or one or more other reservoirs that are to be located on- or off-channel of the watershed; and (3) be designed, with respect to the area located in the watershed and the Arkansas River Valley and any residential or commercial activity therein, to provide more reliable flood control and better sediment control, to increase the water supply, to improve water quality, and to conserve fish and wildlife and preserve the [...]

show full description
Latest Actions
  • 12/20/2007 - Referred to the Subcommittee on Water Resources and Environment.
  • 12/19/2007 - Sponsor introductory remarks on measure. (CR E2650)
  • 12/19/2007 - Referred to the House Committee on Transportation and Infrastructure.
Bill Text
File name Last Updated
H.R.4928 Introduced in House01/09/2008